+65 6270 8899

TENNET

Project Details: TenneT’s 2GW programme is a major offshore-grid standardisation programme designed to connect large-scale North Sea offshore wind generation to the Dutch electricity grid. The IJmuiden Ver Alpha connection includes an offshore platform, underground cable system and a land-based converter station. Scope: HH Group was one of the chosen partners for the supply of […]

UCC Tangguh Onshore Project

Project Details: The Tangguh UCC Onshore Project is a major oil and gas development at the Tangguh LNG facility in West Papua, Indonesia. The project is operated by BP Berau Ltd. and includes onshore gas compression, CCUS facilities, and associated piping and process facilities. The project aims to increase gas production while reducing carbon emissions […]

CPOC PHASE 7

Project Details: CPOC Phase 7 is part of the drilling campaign in the Malaysia–Thailand Joint Development Area. Public reporting identifies the T-16 tender-assisted drilling rig as the incumbent rig for the Phase 7 tender and confirms CPOC as its current client in Malaysia. Scope: HH Group was one of the chosen partners for the supply […]

FSRU HOEGH GANDRIA

Project Details: An FSRU conversion project by Höegh Evi, with the LNG carrier being converted in Singapore. The conversion includes installation of regasification equipment and integration of cargo handling, utility, offloading, electrical and automation systems. Upon completion, the FSRU will be deployed to the Port of Sumed, Egypt, under a 10-year charter with EGAS. The […]

FPSO JAGUAR

Project Details: FPSO Jaguar is being developed for ExxonMobil Guyana’s Whiptail project in the Stabroek Block. The FPSO is being developed by SBM Offshore based on its Fast4Ward® design, with the hull constructed in China and topside fabrication and integration carried out in Singapore. Designed to produce approximately 250,000 barrels of oil per day and […]

FPSO P84

Project Details: P84 is the Petrobras FPSO planned for the Atapu field as part of the second development phase. The FPSO is designed for ultra-deepwater production at a water depth of more than 2,000 metres. The FPSO is expected to reduce the intensity of greenhouse gas emissions by 30% per barrel of oil equivalent produced, […]

FPSO P82

Project Details: FPSO P-82 – Búzios 10: A major Petrobras new-generation FPSO project for the Búzios pre-salt oil field offshore Brazil. The US$3.05 billion project is being executed by Seatrium, with major construction activities carried out in China. The FPSO is designed to produce 225,000 barrels of oil per day, process 12 million m³ of gas […]

Shell Crux

Project Details: The Crux Project forms an important part of Shell Australia’s gas portfolio remains an important backfill opportunity for the existing Prelude FLNG facility. The project consists of a not normally manned (NNM) platform with five production wells, in ocean waters approximately 165 m deep. The facility will be connected to Prelude via a 160km export pipeline. Scope: […]

Barossa Project

Project Details: The Barossa gas field is located 300 kilometres offshore Darwin in northern Australia, and will be developed via the BW Opal FPSO with six subsea production wells, in-field facilities and a gas export pipeline tied into the Bayu-Undan to Darwin pipeline system that supplies gas to Darwin LN Scope: HH Stainless was one […]

Golar GIMI FPSO

Project Details: Conversion of Gimi FLNG from a Moss LNG carrier to a floating LNG production unit. HH Stainless was one of the chosen partners for the supply of Stainless Steel pipes, fittings and flanges. Completion: Ongoing till 2023 | Project secured in 2021 | Photo Credits: https://www.golarlng.com/